E3SMv1 (Water Cycle)

The E3SM version 1 water cycle simulation campaign includes standard set of Coupled Model Intercomparison Project Phase 6 (CMIP6) Diagnosis, Evaluation, and Characterization of Klima (DECK) simulations. These E3SM simulations at standard resolution have been completed and the data is publicly available.

Data Resolution:

The standard resolution configuration of E3SM v1.0 water cycle configuration has approximate horizontal resolution of 1 deg latitude by 1 deg longitude in atmosphere (110 km grid spacing), with ocean and sea ice grid of 60 km in the mid-latitudes and 30 km at the equator and poles, and river transport at 55 km horizontal resolution. This model configuration is described in “v1 1 deg CMIP” page in Scientifically Validated Configurations.

For more details, refer to Coupled E3SM v1 Model Overview or to the reference papers:

Experiments:

The datasets include the following experiments.

For low-resolution:

  • DECK

    • piControl – Pre-industrial control (piControl) simulation (500 years)

    • 1pctCO2 – Prescribed 1% / year CO2 increase (1pctCO2) simulation (150 years)

    • abrupt-4xCO2 – Abrupt CO2 quadrupling (abrupt-4xCO2) simulation (150 years)

    • abrupt-4xCO2-ext300yrs – Abrupt CO2 quadrupling (abrupt-4xCO2) simulation (140-300 years)

  • Historical

    • historical – Historical simulations 1850-2014 (165 years), 5 ensemble members

  • AMIP

    • amip – atmosphere only AMIP simulation 1870-2014 (145 years), 3 ensemble members

    • amip_1850_allF – atmosphere only AMIP with all forcings held at 1850 values, 1870-2014 (145 years), 3 ensemble members

    • amip_1850_aeroF – atmosphere only AMIP with all aerosol forcings held at 1850 values, 1870-2014 (145 years), 3 ensemble members

  • DAMIP

    • damip_hist-GHG – greenhouse gases only, 3 ensemble members

  • Projection

    • ssp5-8.5 – future projection, 5 ensemble members

    • damip_ssp5-8.5-GHG – future projection with greenhouse gases only, 3 ensemble members

For high-resolution:

  • Control Runs

    • A_WCYCL1950S_CMIP6_HR.ne120_oRRS18v3_ICG – 4 ensemble members

  • Transient Production Runs

    • A_WCYCL20TRS_CMIP6_HR.ne120_oRRS18v3_ICG – 2 ensemble members

  • Additional Simulations

    • A_WCYCL1950S_CMIP6_LRtunedHR.ne30_oECv3_ICG – LR tuned HR control run, 1 ensemble member

    • A_WCYCL20TRS_CMIP6_LRtunedHR.ne30_oECv3_ICG – LR tuned HR transient production run, 1 ensemble member

    • F2010-CMIP6-HR – 3 ensemble members

    • F2010C5-CMIP6 – 5 ensemble members. “nudgeUV” refers to U and V wind directions.

    • F2010LRtunedHR – 4 ensemble members

    • A_WCYCLSSP585_CMIP6_HR – future projection, 1 ensemble member